Skip to content

Ryan Road bridge construction at Red Run Drain

July 25, 2012

Beginning soon in August 2012, construction will begin on Ryan Road at the bridge
spanning the Red Run, located between Chicago Road and 14 mile road in Warren.

https://redrundrain.wordpress.com/2012/07/06/ryan-road-bridge-summer-construction-2012/

The construction diagrams show the LEFT Hand Turn Lane disappearing;
and a traffic shift; to still allow 2 lanes traveling north/south on Ryan.
Barrels will block access to the left-hand-turn-lane, so please be cautious.
Construction rehabilitation is planned between August – October with
everything finalized by the first week of November 2012.

~~~ click to enlarge diagram ~~~

Ryan Road_ Red Run_ Bridge Construction 2012

Ryan Road_ Red Run_ Bridge Construction 2012

At the Warren City Council Meeting – Tuesday, July 24, 2012
the bid with DiPonio Contracting, Inc. was approved.
The bid award was for $269,000.

Traffic volume on Ryan Road Bridge is around 25,000 vehicles per day.
http://www.semcog.org/Data/Apps/crash.report.cfm?type=1&id=3722

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: