Sanitary Relief Drains to cost $ 19 MILLION
The City of Warren will be constructing the following new sanitary
drains to relieve collection system surcharging during periods of
heavy rainfall or snowmelt.

12 Mile Road Relief Drain

Location: Within the 12 Mile Road right of way from its
intersection with the centerline of the St. Edmunds Drive right
of way, west to its termination point 155 feet west of the
centerline of the south Newport Drive right of way.
Map
http://www.bing.com/maps/?v=2&cp=42.500278~-82.995117&lvl=14&dir=0&sty=r&q=%20newport%20drive,%20warren,%20michigan&form=LMLTCC

General Description of Work: Installation of approximately 4,300
linear feet of 21” to 48” diameter sanitary drain, installation
of a double barrel siphon under the Schoenherr Drain,
interconnection of the existing sanitary drains in the work area
to the new sanitary drain, installation of approximately 4,200
linear feet of 12” diameter watermain complete with all service
transfers, fire hydrants, and gate wells, and replacement of all
affected roadway, driveways and sidewalks, and landscaped areas
disturbed by construction, inclusive of all engineering,
inspection, testing and permitting costs associated with the
execution and completion of the work.

10 Mile Road Relief Drain

Location: Within the 10 Mile Road right of way from a point 420
linear feet west of its intersection with the centerline of the
Hoover Road right of way east to its termination point 860 feet
east of the centerline of the Roan Road right of way.

General Description of Work: Installation of approximately
3,400 linear feet of 36” diameter sanitary sewer, interconnection
of the existing sanitary drains in the work area to the new
sanitary drain, installation of approximately 3,400 linear feet
of 12” diameter watermain complete with all service transfers,
fire hydrants, and gate wells, and replacement of all affected
roadway, driveways and sidewalks, and landscaped areas disturbed
by construction, inclusive of all engineering, inspection,
testing and permitting costs associated with the execution and
completion of the work.

PROJECT COST ESTIMATES
Estimated Construction Costs,
Administration Costs, Easement
Acquisition and Engineering,
Inspection, Testing,
Permitting Financing Costs
(including Bond Discount)
and Contingency
—Not to Exceed $18,775,000 —

Period of Usefulness of the Project
Not less than 30 years from date of completion.

CITY OF WARREN
Macomb County, Michigan
CITY OF WARREN CAPITAL IMPROVEMENT BONDS, SERIES 2013
www.i-dealprospectus.com/PDF/1_60949.pdf‎

SECURITY FOR THE BONDS
The City agrees to pledge for the repayment of the Bonds
sufficient amounts of City taxes levied each year provided that
the amount of taxes necessary to pay the principal and interest
on the Bonds, together with the other taxes levied for the same
year, shall not exceed the limit authorized by law.

Advertisements
Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: