George W. Kuhn Drain 2001 improvements

George W. Kuhn Drain improvements from 2001

Contract awarded to Tetra Tech MPS for design of GWK Retention Treatment Facility.
The construction contract was awarded to Walbridge Aldinger Construction Co. Inc.,
Cost was $79,460,000

The improvements included :
a.) the new inlet weir structure
b.) existing inlet structure modifications
c.) dewatering pumping station
d.) sodium hypochlorite (bleach) storage building,
e.) dewatering pumping station outlet sewer and force main,
f.) connection to the rerouted Madison Heights combined sewer overflow
g.) extension of the parallel storm drains adjacent to the new inlet weir structure.

Taken from :
http://www.oakgov.com/water/projects/GWKDescrip.html

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: